Ackerman Creek: In
the summer of 2002 TU volunteers completed a solar irrigation
project on a tributary of the Russian River west of Ukiah. Funding
came from a grant from the California Department of the Fish & Game
(CDFG). Other partners included the landowner, Mendocino Redwood
Company (MRC), and the California Conservation Corps.
The project goal was to irrigate approximately 200 trees
that had been planted on the stream bank above a culvert. MRC,
in an earlier project, had already replaced the culvert with
a railroad car bridge and the area above the bridge received
some bioengineering restoration including the planting of the
trees. Ukiah is known for its very hot summer weather that
would make the survival of a tree-planting project doubtful
without irrigation. TU volunteers found out how hot Ukiah can
get when they were running irrigation lines to the trees on
the open stream bank in 100+ degree weather!
A California Department Fish and Game grant had enabled irrigation systems similar to this one to be installed by TU volunteers earlier in 2002 in Mill Creek, a Russian River tributary north of Ukiah, and in 2001, on Pena Creek, a tributary of Dry Creek below Warm Springs Dam near Healdsburg.
The solar irrigation system works by using a solar powered DC submersible pump-to-pump water up to the storage tank from the creek. A battery powered timer then releases water from the tank to the drip irrigation lines that run to the trees. The tank is located high enough above the drip irrigation emitters to provide enough gravity head pressure to run the system. At the Pena Creek and Mill Creek locations tiny "sprayers" were used rather than emitters to spray down willow "mattresses" on the stream bank and willow instream "deflectors" that will restore erosion damaged areas using bioengineering.
Submitted by Brian Hines, North Coast Chapter
|
Austin Creek:
The Austin Creek watershed, covering 44,761 acres (approximately
70 square miles), is a major tributary to the lower Russian
River in Sonoma County, and was once known for its prolific
coho and
steelhead populations. Modern land uses have significantly
impacted these fisheries and led to a serious decline in
fish populations.
Lower Austin Creek is highly aggraded (filled with sediment)
and stream temperatures are warm. Spawning habitat is present
but rearing habitat is in short supply and unsuitable. We
are working with our partners in a cooperative effort to reverse
this trend.
In 2003, the NCCP expanded into this watershed when
TU partnered with a private landowner and government agencies
to implement
the Lower Austin Creek Migration Improvement Project (LACMIP).
Our
partners include Bohan and Canelis, a family-owned gravel mining
company that has been working in the watershed for over three
decades, the California Department of Fish and Game, NOAA
Fisheries, the
Sonoma County Water Agency and the California Conservation
Corps.
The reach from the mouth of Austin Creek to the upper end
of the LACMIP is characterized by long riffle/flatwater units
with intermittent
flow and few pools, except for a few bedrock or boulder outcroppings
and little shelter, except where terrestrial vegetation exists.
In general, lower Austin Creek is inadequate for salmonid
rearing habitat but serves as a migration corridor. However,
relatively
few pools of adequate depth exist for salmonid resting habitat
and there is a lack of large woody debris, for shelter during
the adult migration period. The aggraded, undefined channel
and low
stream depth may also be impacting out migration of juveniles.
The
LACMIP was designed and implemented within about 6 months to
improve 4,000 feet of juvenile and adult steelhead trout
and coho
salmon habitat in lower Austin Creek. In fall, 2003, complex
structure (root wads and boulders) was added to excavated
pools to maintain
scour and add resting cover for adult and juvenile salmonids.
The installed structures are intended to recruit and sort
spawning gravel and provide pool habitat. This will encourage
mid-channel
scour and discourage lateral bank erosion within the
improved zone. Digger log structures will be utilized where
banks
are stable to
create lateral scour and enhance backwater pools for
rearing fish. In 2004, last year's work will be evaluated
and additional
work will
proceed based on the evaluation.
 |
 |
 |
 |
 |
 |
 |
| Click
images for larger view |
|
|
|
Future activities identified by TU include working with
private landowners in the upper watershed to reduce sediment
loading
to the creek and restoring stream habitat. We also will
be actively
participating in the Captive Broodstock Program. The
goal for this project is to reestablish wild, naturally producing
coho
populations
using broodstock from Russian River.
|
| |
 |
Best viewed at high screen resolution |
|
Bridge Creek is a tributary to the
South Branch of the North Fork Navarro River located in Mendocino
County. The Bridge Creek Fish
Passage Improvement Project implemented in 2003 involved the
removal of 2 culverts near the mouth of Bridge Creek which presented
a complete
barrier
to steelhead trout migration. The culverts were replaced with
a bridge and rock weirs placed in the stream channel to restore
the natural width and grade of the channel. An estimated 1.5
miles of spawning and rearing habitat for steelhead trout upstream
was made available to spawning steelhead by the removing the
culverts. The project also removed over 4000
cubic yards of fill material on the verge of failing and delivering
sediment
to the
South Branch of the North Fork Navarro River. The project was
funded by Trout Unlimited, California Department of Fish and
Game, NOAA Fisheries, and the Mendocino Redwood Company. |
The 18,074-acre Elk Creek watershed
is located in Mendocino County. The creek enters the Pacific
Ocean
approximately
15 miles south of Mendocino near the town of Elk. This project
is part of the North Coast Coho Project. Most of the Elk
Creek watershed is located on land owned by Mendocino Redwood
Company.
 |
Click image for Elk Creek project
pics
|
Approximately 3 miles of streamside road along Elk Creek
was selected for sediment control measures. The sites selected
for treatments are chronic sediment sources that not only have
negative impacts
in the watershed on an annual basis but also, in some cases,
have the potential for catastrophic failure. TU will work with
MRC to develop watershed-wide restoration prescriptions, making
this project the first step in a multiyear comprehensive endeavor. Erosion from the road delivers sediment directly into Elk Creek, which is habitat for steelhead and coho salmon. Many years of grading and maintenance have resulted in a wide road with large volumes of sidecast fill perched above Elk Creek. This side cast is starting to fail and to slough into Elk Creek resulting in the delivery of excessive sediment.
During the summer 2003 field season, erosion control
features were installed on approximately 3 miles of Elk Creek
Road. The
entire dirt road was resurfaced with a six inch layer of rock,
outslopes and rolling dips were installed, and perched fill material
along the road was removed. Several culverts were replaced and
rock armoring was installed at culvert outlets and at one ford.
Areas disturbed by construction were grass seeded and straw hay
mulched initially; tree planting will occur this winter. The total
volume of sediment controlled is estimated to be 13,800 cubic
yards.
This project is funded by the California Department of Fish
and Game, Mendocino Redwood Company, and Trout Unlimited. Work
was completed in Fall 2003.
|
The Garcia River enters the ocean at Point Arena. Soon after Mendocino Redwoods purchased LP's lands, ex-logger Craig Bell (right), coordinator of the local Garcia Watershed Advisory Group, approached TU's Steve Trafton to talk about a sedimentation reduction plan.
More detail, courtesy of Trout magazine: Reading Room>California Dreamweavers |
Hollow Tree Creek is
a tributary to the South Fork Eel River. It enters the Eel immediately
upstream of the town of Leggett in Mendocino County. Hollow Tree
Creek may be the largest producer of coho salmon in the entire
Eel River watershed, according to several studies. Restoration
work is underway on property owned by Mendocino Redwood Company
(MRC).
Outmigrant
trapping by MRC biologists in 2001 produced annual estimates
of 25,000 steelhead and 35,000
coho; the watershed also produces Chinook salmon. This data
supports the idea that Hollow Tree
Creek may be the largest producer of coho salmon in the entire
Eel River watershed.
Hollow Tree Creek Assessment
In 2001 TU contracted the services of Pacific Watershed Associates to
conduct a sediment source assessment of the Hollow Tree Creek watershed.
Of the 652 sites assessed, 619 were recommended for treatment. It was
calculated that these sites had the potential to deliver 136,526 cubic
yards of sediment into important spawning and rearing habitat. These
site prescriptions include treatments for problems such as failing
culverts, landslides, and stream crossings that need repair or removal
so that water can flow through properly. Other sediment sources to
be rectified include major springs, gullies, and bank erosion sites.
Additionally, chronic erosion from logging roads will also be treated.
Restoration
The first phase of the restoration of the entire watershed, and specifically of 216 of the 619 sites started in June 2003. The upslope portion of the project will be conducted by Pacific Watershed Associates and will result in a near-total road-related sediment reduction to Hollow Tree Creek. This includes decommissioning of old roads and upgrading roads still in use. This will effectively obviate road-related sediment as a limiting factor in watershed health, and will allow Hollow Tree Creek and its tributaries to begin the process of reclaiming salmonid spawning and rearing habitat that has been degraded by decades of accumulated sediment.
In 2003 work was completed in the following drainages: Waldron,
Bear Pen, Bear Wallow, Little Bear Wallow, the head of Hollow
Tree Creek, and near the confluence of Hollow Tree Creek and
Butler Creek. In addition, work was completed along the mainline
Hollow Tree Road. The restoration/upgrade work involved: road
abandonment, construction of permanent crossroad drainage structures
along abandoned roads, abandoning watercourse crossing and
re-aligning them to there natural grade/width, watercourse
crossing upgrades (culverts, rocked rolling dips, or rocked
fords), berm removal, outsloping, rocking, and the installation
of permanent rolling dips.
 |
Summary of 2003 Hollow Tree Grant
Work
- # of Site Treated/Completed = 176
- Class I Watercourse Crossing Abandoned = 4
- Class II Watercourse Crossing Abandoned = 14
- Class III Watercourse Crossing Abandoned = 30
- Class II Watercourse Crossing Upgraded = 6
- Class III Watercourse Crossing Upgraded = 24
- Miles of Class I Road Abandonment = 2.29
- Miles of Class II Road Abandonment = 4.17
- Miles of Class III Road Abandonment = .21
- Miles of Class I Road Upgrade = 4.98
- Miles of Upslope Road Abandonment = 1.93
- Class III Road Upgrade = 830 feet
- Miles of Upslope Road Upgrade = 10.07
- Dips Created to Drain Cut Bank Seeps = 6
- Rocked Fords = 6
- Rocked Dips = 3
- Miles of Brushing = 2.5
- # of watercourses running through old landing that
were abandoned = 7
- Approximate 2003 Sediment Savings (yds3) = 48,458
Click image for PDF
(925 KB) of more project pictures
|
Partnering with the California Conservation Corps
The California Conservation Corps (CCC) will conduct the instream portion of the project. The California Conservation Corps engages young men and women in meaningful work, public service and educational activities that assist them in becoming more responsible citizens, while protecting and enhancing California’s environment, human resources and communities.
TU has regularly partnered with the CCC on projects of this nature. The work by these young individuals is essential to the future health of Hollow Tree Creek and to salmonids. This work will accelerate the pace of recovery by providing mechanisms such as root wads and logs through which the stream can begin to scour itself and by providing immediate habitat to salmon and steelhead for spawning, rearing, cover and concealment. Root wads and logs will be sourced from the upslope road decommissioning projects where they were used in the past to create the foundation for roads.
This project is funded by the California Department of Fish and Game, Mendocino Redwood Company, Unite States Fish and Wildlife Service, the National Oceanic and Atmospheric Administration, and the California Conservation Corps.
|
The Little North Fork Ten Mile River is a known coho producing tributary which enters the Pacific ocean north of Fort Bragg. TU received funding in 2003 to begin restoration work.
In 2001 property owners Hawthorne Timber Company through its manager Campbell Timberland Management hired Pacific Watershed Associates to conduct an assessment of the Little North Fork Ten Mile River. The Ten Mile River watershed was judged to have high sensitivity for sediment deposition but the Little North Fork displayed high erosion characteristics.
In this project 32 different sites along 3.4 miles of road will be treated for erosion prevention with estimated sediment saving of 9,453 cubic yards.
The California Department of Fish and Game and Campbell Timberland
Management fund this project. Work began in Summer 2003.
|
Pudding Creek is a small coastal watershed that enters the Pacific Ocean just north of Fort Bragg, Mendocino County. Despite its small size, the watershed was historically a prolific coho salmon producer. Anecdotal information describes fish densities so thick that migrating coho were pushed out onto the bank or that horses were frightened by the sight and sound of them. The California Department of Fish and Game estimates in the 1960’s 6000 adult coho salmon provide some truth to the regional stories.
A remnant population of wild coho salmon persists in Pudding Creek today. Pudding Creek has many of the attributes associated with high coho producing streams. However, high levels of sedimentation have been identified as a serious impediment to the creeks ability to carry spawning salmon.
The objective of this project is to “storm proof” 6.2
miles of riparian road along the mainstem of Pudding Creek.
Forty-six individual sites will be treated for erosion prevention
with an estimated sediment savings of 14,006 cubic yards.
This
project is funded by the California Department of Fish and
Game and Campbell Timberland Management. Work began in Summer
2003.
(Click image above for larger, captioned view of Project
log entry of 1/18/05.)
|
Ten Mile River is
a steelhead and coho salmon producing stream that drains directly
into the Pacific Ocean approximately 6 miles north of Fort Bragg,
CA. This 119 square mile coastal
watershed is located in western Mendocino County. Ten Mile River
watershed is composed of coniferous forests and is managed primarily
for timber production. Campbell Timberland Management LLC. manages
approximately 90% of the watershed area. The remaining 10% of
the watershed area is owned and managed by other private entities.
In 2001, Pacific Watershed Associates was contracted to conduct
a watershed inventory with the aim of identifying all locations
with future road-related sediment delivery and to produce a prioritized
plan of action for erosion prevention and watershed restoration
in 5 sub-watersheds of the Ten Mile River watershed. This project
was funded through a California Department of Fish and Game S.B. 271 grant
and was supplemented by partial matching funds from Trout Unlimited
and Campbell Timberland Management LLC.
Project Description
The Ten Mile River watershed assessment process consisted of three distinct
project elements. These included: 1) an analysis of historic aerial photos
to determine the road construction history for the watershed, 2) a complete
field inventory of all current and future road related sediment sources along
350 miles of road, and 3) the development of a prioritized plan-of-action for
costeffective erosion control and erosion prevention treatments.
In the first phase of the Ten Mile River inventory project all roads within
the study area were identified from historic aerial photography and used to
augment existing road maps provided by Campbell Timberland Management. A composite
map of the road system in Ten Mile River was developed from the base maps produced
by Campbell Timberland Management and the unmapped roads identified during
the air photo analysis. The composite map depicts the primary road network
in the watershed and was used as the base map for field mapping and showing
the location of sites with potential for future erosion and sediment delivery
to the stream system.
The second phase of the project involved a complete inventory of the road systems
in the watershed. Technically, this assessment is neither an erosion inventory
nor a road maintenance inventory. Rather, it is an inventory of sites where
there is a potential for future sediment delivery to the stream system that
could impact fish bearing streams in the watershed. Campbell Timberland Management
provided updated base maps as well as well as input regarding expected future
use for all of the inventoried sub-watersheds. All roads, including both maintained
and abandoned routes, were walked and inspected by trained personnel and all
existing and potential erosion sites were identified. All facets of the inventory
were conducted by Pacific Watershed Associates. This included a rapid field
review of all identified site locations and treatment prescriptions. Sites,
as defined in this assessment, include locations where there is direct evidence
that future erosion or mass wasting could be expected to deliver sediment to
a stream channel. Sites of past erosion were not inventoried unless there was
a potential for additional future sediment delivery. Similarly, sites of future
erosion that were not expected to deliver sediment to a stream channel were
identified but were not included in the assessment.
In the final phase of the watershed assessment project, inventory results were
analyzed, cost effective erosion control and erosion prevention prescriptions
were finalized and a prioritized plan-of-action was completed
Inventory Results
Approximately 350 miles of roads were inventoried for future sediment sources
within five subwatersheds of the Ten Mile River watershed. Inventoried road-related
erosion sites in the assessment area fell into one of two treatment categories:
1) upgrade sites - defined as sites on maintained open roads that are to be
retained for access and management and 2) decommission sites - defined as sites
exhibiting the potential for future sediment delivery that have been recommended
for either temporary or permanent closure. Virtually all future road-related
erosion and sediment delivery in the Ten Mile River watershed is expected to
come from four sources: 1) the failure of road and landing fills (landsliding),
2) erosion at or associated with stream crossings (from several possible causes),
3) road surface and ditch erosion, and 4) gully erosion below ditch relief
culvert outlets.
A total of 1,041 sites were identified with the potential to deliver sediment
to streams. Of these, 1,008 sites were recommended for erosion control and
erosion prevention treatment. Approximately 73% of the sites recommended for
treatment are classified as stream crossings and 7% as potential landslides.
The remaining 21%) of the inventoried sites consist of other sites which
include ditch relief culverts and gullies.
Click
on image for larger, captioned view of culvert replacement, in
Project log entry of 1/18/05

|
|